Questions owners and investors ask about construction

EMC Development Solutions Corp. California Contractor License #1160113, Class B (General Building).

Plain answers for owners and investors in Los Angeles County, Orange County and the Inland Empire. For licensing, insurance, payments and subcontractors, see the Construction page.

Common questions

What kind of projects do you take on?

EMC Development Solutions Corp takes on complex custom homes in Los Angeles County, Orange County and the Inland Empire, including hillside lots and homes with pools or elevators. We also take on multi-unit work, and we take over stalled projects and finish them. Every job is priced in a written proposal and a signed contract before work begins, and the scope is in writing before any number appears. We will tell you on the first call whether the job is a fit. Full pages: custom homes in Los Angeles and hillside construction in Los Angeles.

How much does an ADU cost in Los Angeles County?

We give no price here, because a fair price comes from a written scope for your lot. The cost depends on the type of ADU (garage conversion, attached, detached or second-story), the slope, soil and access on your lot, the utilities and sewer connection, fees, and finishes. Plans and engineering are usually contracted and paid for separately from the building contract. EMC Development Solutions Corp prices every job from a written scope, and the scope comes before the number. Full guide: what drives the cost of building an ADU in Los Angeles County.

Can I convert my garage into an ADU?

Often, yes. State law lets an owner convert an existing garage into an ADU, and your city or county may not make you replace the parking the garage held. The space needs exterior access and side and rear setbacks sufficient for fire and safety, and the converted garage still has to meet the building rules for a home. Your building department decides what plans, clearances and inspections that takes. EMC Development Solutions Corp does not prepare plans. Full guide: converting a garage into an ADU.

Do you build additions and remodels?

Yes. EMC Development Solutions Corp builds additions and remodels in Los Angeles County, Orange County and the Inland Empire, and also takes general building work. Every job is priced in a written proposal and a signed contract before work begins, and the scope is in writing before any number appears. We will tell you on the first call whether the job is a fit. Full page: additions and remodels in Los Angeles County.

Do you draw plans?

No. EMC Development Solutions Corp does not prepare plans or answer plan corrections. We build from plans that come from the owner's designer, architect or engineer. Any part a building department says needs engineering must come from a licensed engineer or architect. A complete set of plans also gives you bids you can compare. Full guide: who pays for plans and engineering.

Do you build ADUs in Orange County and the Inland Empire, or only Los Angeles County?

EMC Development Solutions Corp builds ADUs in Los Angeles County, Orange County and the Inland Empire. An ADU is an additional, self-contained home on a residential lot. One accountable builder carries the sequencing, the trades, the inspections and the cost, from scope to final inspection. We will tell you on the first call whether the job is a fit. Full page: ADU builder in Los Angeles County.

Can you build foundations and retaining walls on a hillside lot?

Yes. EMC Development Solutions Corp builds foundations and retaining walls as part of a building project, and hillside foundation work is one example of the complex construction we take on. Slope, soil and access all affect the work on a hillside lot, which may need a deeper foundation, grading or retaining walls. We will tell you on the first call whether the job is a fit. Full page: multi-unit construction in Los Angeles County.

How long is an ADU permit good for in Los Angeles County?

Under state law, a building permit stays valid if work starts within 12 months after it is issued and the work is not abandoned. The building official may grant extensions in writing when the permit holder asks and shows good cause. When work stops partway, each department applies its own rule for when the permit has expired and how to revive it. Either way, ask the office that issued your permit for your exact date, in writing. Full guide: an expired or stalled ADU permit.

Why is my ADU permit stuck, and what should I ask the building department?

Common causes are simple: a correction went unanswered, a clearance is still open at another department such as sewer or utility capacity, fire access or planning review, fees were not paid, or a designer or contractor left. Call the office that holds your file and ask for the status, the date of the last action, which corrections or clearances are still open, the expiration date, and whether an extension or renewal is possible. Write down the date and the name of the person you spoke with. Full guide: an expired or stalled ADU permit.

How do I compare ADU bids from different contractors?

Put the bids side by side and make sure every bidder is pricing the same plans. Check which fees, utility connections and site work are in each bid and which are left to you, what the allowances are, what is left out in writing, and whether each payment follows completed work. Confirm that the contractor's license is active on the Contractors State License Board website at cslb.ca.gov. The lowest number is not always the lowest cost, because a bid that leaves out the sewer work or the fees looks cheaper until those items arrive. Full guide: what drives the cost of building an ADU in Los Angeles County.

Can a new contractor finish an ADU someone else started?

Often, yes. A new builder has to know what is already there before pricing the rest, so gather the permit and approved plans, the inspection record, your contract and payments with the previous contractor, and any written lien releases. Framing, plumbing, electrical or insulation may have been covered before it was inspected, and an inspector may require it to be opened, so take dated photos now. When a half-built ADU has an active permit and a clear record, EMC Development Solutions Corp can look at taking over the construction. Full guide: finishing a half-built ADU.

How long does construction take?

Once the permit is issued, a garage conversion typically takes about 3 months to build, a detached ADU about 6 months, a large single-family house about 8 months, and a hillside or custom home 1 to 1.5 years. Design, plan check and permits come before that and are not included in these times. Inspections, utility connections, conditions found once work begins, and changes made during the job can all add time. These are typical ranges, not promised dates. Your written contract states the approximate start and completion dates for your job.

How do you price a job?

We price every job from a written scope for your project. The written proposal can set out more than one option, and the price and payment terms of each are spelled out so you can compare them. A per-square-foot number can be a rough first guide in an early conversation, but it is never the price, because your lot, your plans and your finishes decide the cost. For how payments work, see "How do you handle money on a project?"

How long until I get a proposal?

After you contact us, we reply within one business day with a short letter of interest: whether the job is a fit, and what we need from you next. It carries no price. Once we have seen the site and have your plans or written scope, a written estimate or proposal usually follows within 3 to 5 business days. A larger or more complex job can take longer, and we will tell you when we see the site if it will.

What kind of contract do you use?

Every job runs on a written contract, signed by you and by us before work begins, and every change is a written change order signed before the changed work is done. Depending on the job, the contract is a lump sum (one price for the written scope) or a guaranteed maximum price (the cost of the work plus our fee, up to a written ceiling). On home improvement work at a residence, such as a remodel, addition, garage conversion or ADU, California requires the contract to state the price in dollars and cents, so those jobs use one of these two forms, and the price or the ceiling changes only by signed change order. On other work, such as some development and commercial projects, cost plus a fee is also available. Your proposal tells you which form fits your job.

How do you handle money on a project?

Your contract states the payment schedule. After a down payment within the legal limit, each progress payment is tied to completed work. Every change to the price or scope is a written change order, signed before the work is done. Full guide: licensing, insurance, payments and subcontractors.

Do you offer financing?

No. EMC Development Solutions Corp does not lend money and does not arrange loans. Many owners pay for construction with a construction loan or a home-equity loan from their own bank or lender. If a lender is paying for your job, send us its draw requirements before you sign, and we will tell you plainly what we can meet.

More questions

Are you licensed?

EMC Development Solutions Corp holds California Contractor License #1160113, Class B (General Building). You can look it up on the Contractors State License Board website at cslb.ca.gov. Full guide: licensing, insurance, payments and subcontractors.

Do you use subcontractors?

EMC Development Solutions Corp is the one accountable point for sequencing, trades, inspections and cost. Subcontractors work under written subcontracts, and trades and inspections are sequenced up front. On a home improvement job, if you ask, we provide lien releases from subcontractors and suppliers for the work you have paid for. On other jobs, the contract sets how releases are handled. Ask us before you sign which trades will be subcontracted, and to whom. Full guide: licensing, insurance, payments and subcontractors.

How big is your team?

EMC Development Solutions Corp is a small team led by Erick Chung, with licensed trade subcontractors on each job. Erick Chung is the qualifying individual on the Corp's contractor license and the person you deal with on your job. Full page: about the Corp.

Where is your office?

Our office is in Claremont, California. We build in Los Angeles County, Orange County and the Inland Empire, and we come to your project site.

What makes you different from other contractors?

Every job runs on six things. Analysis: before we give a price, we read the plans, the site and the code. Communication: you hear from us early and in writing, good news and bad. Decision making: each decision is made at the right time by the right person, and it is written down. Layering: crews and trades are sequenced so they keep moving without getting in each other's way. Precision: the work is built to the drawings, and measured before it is built. Verification: each stage is checked before it is covered up. Full page: about the Corp.

What documents do you keep during construction?

Every job runs on a written record: the signed contract, a signed change order for every change, the permit and inspection record, and a lien release from us on California's statutory forms with each payment. Payments follow the schedule in your contract, and on larger or lender-funded jobs each payment request is set against a schedule of values that shows the work completed line by line. If your lender or your contract calls for AIA forms, such as the G702 payment application, tell us before you sign. Subcontractors and suppliers may send you a preliminary notice early in the job; the law has them send it to protect their lien rights, it is routine, and on a home improvement job you can ask us for lien releases from them for the work you have paid for. If you ever receive a stop payment notice, a written claim from someone who says they have not been paid, send it to us the same day. At final inspection you receive the closeout record, and we keep the job file for at least five years after completion, as California's contractor law requires. Full guide: licensing, insurance, payments and subcontractors.

What kind of warranties do you offer?

EMC Development Solutions Corp does not offer a separate written warranty on its work, unless your signed contract states one. Your protection comes from California law and the building department: the work must follow the approved plans and the building code, and it is inspected before it is signed off. California's contractor license law holds every licensed contractor to accepted trade standards for good and workmanlike construction, and an owner can file a complaint with the Contractors State License Board at cslb.ca.gov. Products we install, such as windows, fixtures and equipment, often carry a manufacturer's warranty; that warranty comes from the manufacturer, not from us, and its paperwork goes into your closeout record. Nothing on this page limits any right California law gives you.

What fees should I expect?

Plan check, permits and inspections carry fees. Utility connections and some other agency charges can apply. Ask the building department for the fee list that applies to your unit. Full guide: what drives the cost of building an ADU in Los Angeles County.

Why do utilities matter?

Electrical service, water, gas and the sewer connection are often where the surprises are. Ask how far the new unit is from each connection. The location and capacity of the sewer line can affect both the work and the timeline. Full guide: what drives the cost of building an ADU in Los Angeles County.

Is EMC licensed and insured?

EMC Development Solutions Corp is licensed by the California Contractors State License Board. You can check the license record at cslb.ca.gov. Ask us in writing, before you sign, what coverage applies to your project. Full guide: licensing, insurance, payments and subcontractors.

Do fire rules add cost?

Fire access to the unit, and in some cases fire sprinklers, depend on the lot and on the department that reviews it. Ask early what applies to your property. It is far cheaper to learn at the plan stage than after the walls are closed. Full guide: what drives the cost of building an ADU in Los Angeles County.

Do setbacks apply to a garage conversion?

For the state's fast approval path, the side and rear setbacks must be "sufficient for fire and safety." On setbacks, Government Code section 66314(d)(7) says no setback is required for an existing structure that is converted. The fire and safety condition still applies, so a garage close to the property line is for the building and fire officials to judge. Full guide: converting a garage into an ADU.

What happens if my ADU application expires in plan check in Los Angeles?

An application in review has its own expiration date, counted from when it was filed, and it can run out while corrections sit unanswered. Ask the office that holds your file for the exact date and whether you can still request an extension, because some departments allow one only before the date passes. After the date you may need to file again, and a new filing is reviewed under the codes and fees in force at that time. Full guide: an expired or stalled ADU permit.