Hillside contractor in Los Angeles: hillside construction from approved plans to final inspection
California Contractor License #1160113, Class B (General Building)
Last updated November 18, 2026.
Quick answer
We accept high-complexity hillside jobs: piles, lagging, shoring, retaining walls, barricades, waterproofing, subdrains, erosion control and soil management, and whatever else the slope calls for. Planning hillside construction? Call (909) 486-3818.
A hillside lot changes the work. Slope, soil, drainage and access all affect how a building goes up there. We build multi-unit buildings, homes, additions and ADUs on hillside lots from plans that are complete and approved before the first day on site. We build in Los Angeles County, Orange County and the Inland Empire.
What does EMC build on a hillside lot?
On a hillside lot we build multi-unit buildings, homes, additions and ADUs. Hillside work is a barrier to entry for many builders. It is the work we are set up for, and we take on the whole project under one contract, with the licensed trades, such as landscaping, grading, storm water and sewer, working as our subcontractors.
On a hillside lot, grading and ramping are done on the natural hillside to reach the deepest and highest parts of the construction, and retaining walls, piles, lagging and shoring go in before the building foundation. For the soils report that comes first, the usual foundation systems and the City grading rules, read hillside foundations in Los Angeles.
What do the plans and reports need to include?
We work from the approved plans provided by the owner and reviewed by us. We review the owner's plans before we accept a job. Plans normally include architectural, structural, civil and Title 24 energy sheets, and sometimes mechanical, electrical and plumbing sheets, depending on the city. The list is not limited to these.
Reports are kept separate from the plans. They can include soils, liquefaction, methane and a topographic survey, where the lot needs them, and the list is not limited to these. If a relevant report is needed, we can arrange it through licensed subcontractors. If you do not yet have a design team, we know a strong network of designers, architects and engineers across Southern California and can introduce you to the right one.
How does a hillside job come to us?
A letter of interest and a walk of the job
It starts with a letter of interest and a walk of the job, so we can get to know each other. Fit is not decided on that walk.
Fit
We determine fit on plans that are 90 to 100 percent complete, and on how the owner wants the job to run and the timeline. When we have the plans and the relevant reports, we tell you plainly what the construction involves.
Proposal, review and contract
We issue a written proposal, and you review it. It names the work the plans show and the relevant reports recommend, with the exclusions and assumptions. If the budget fits, we contract the building, once the plans are approved. Every job is priced in a written proposal and a signed contract before work begins. The contract states the approximate start and completion dates.
How is the construction phased?
Construction and phasing are scheduled to run from the first day on site through completion. Trades and materials are sequenced up front, inspections are sequenced with lead time, and every subcontractor is informed and shares the schedule from the start. The building inspections along the way are part of the construction contract. Work starts only after the permit is issued.
What does closeout include?
Closeout is administrative rather than physical construction. Before the Certificate of Occupancy, closeout can entail closing requirements with departments such as Planning, Recreation and Parks, the Bureau of Engineering and the Bureau of Contract Administration (for as-builts), along with a survey of heights for Planning and storm water observation and completion certificates. These are examples, not a complete list. It ends with the final inspection and, where the building department issues one, the Certificate of Occupancy, with a complete record handed to you. The final inspection is part of the construction contract.
How long does a hillside build take?
Once the permit is issued, a hillside or custom home typically takes 1 to 1.5 years to build, not counting delays caused by the City. Those delays are documented and credited to the completion date, and we tell you about every delay. For comparison, a large single-family house typically takes about 8 months. These are typical ranges (see the note below).
What may the City and County add on a hillside lot?
Depending on the lot, the City of Los Angeles or Los Angeles County may add to the plans and reports. The list can include:
- a grading plan;
- sheets for site drainage, storm water runoff, and slope planting and irrigation;
- surcharge, compaction and slopes;
- retaining walls and piles;
- a methane soils investigation, where the lot calls for one;
- hydrology and liquefaction studies, where the lot calls for them;
- remedial grading, such as removal and recompaction, where conditions found during excavation call for it.
The designers and engineers prepare these, and we build what the approved plans call for.
Some facts about the City of Los Angeles and Los Angeles County: on single-family lots in mapped hillside areas, the City limits residential floor area and grading by lot size. Some hillside areas of the City also limit work hours and haul trucks. Where Los Angeles County is the building authority and sends a hillside plan to its geotechnical reviewers, the plans have to reflect what the geotechnical reports recommend. Other departments have their own rules, and details are in the sources below and the note. For the rules on grading limits, the hillside map and the soils report, see the hillside ADU rules in Los Angeles.
Sources
- City Planning, Hillside Construction Regulations Fact Sheet and FAQs (undated). The Baseline Hillside Ordinance, introduced in 2011 and amended in 2017, sets "limitations on residential floor area and the amount of allowable grading based on lot size" for single-family lots zoned R1, RS, RE or RA within a designated Hillside Area, and applies if Zoning Information ZI-2462 is shown in your ZIMAS property profile. Where the City has applied the Hillside Construction Regulations, for example in Bel Air, Beverly Crest, Laurel Canyon, Kirkwood and Bird Streets, haul trips are limited to no more than four per hour, construction hours are Monday to Friday, 8:00 AM to 6:00 PM, with only interior construction on Saturdays, and a haul route approval is required for the import or export of 1,000 or more cubic yards of soil.
- LADBS Information Bulletin P/BC 2026-068 (effective January 1, 2026): the exploratory work "shall be performed by a licensed soils engineer and a licensed engineering geologist on all hillside grading work, except wherein waived by the Department."
- LADBS Grading Division: "Prior to issuing permits, a soils and/or geology report is usually required to be submitted to the Division for technical review by our geotechnical engineers and geologists."
- Los Angeles County Public Works, Manual for Preparation of Geotechnical Reports (February 5, 2025): the Geotechnical and Materials Engineering Division "does not recommend specific geologic or geotechnical reports for approval" but recommends the grading and building plans that go with them, and "the development plans will need to accurately reflect the recommendations from the geologic and geotechnical reports." Where the County is the building authority, the Building Official issues the permits. The manual's list of what a geotechnical report covers includes slope stability, groundwater, rainfall and irrigation, liquefaction, retaining walls with surcharge, and removal and recompaction. The Building and Safety Division's plan checkers determine whether a clearance from the Division is required (Section 1.3.1).
Note. EMC Development Solutions Corp is a private building contractor, California Contractor License #1160113, Class B (General Building). This page is general information about how we work. We do not prepare plans or ground reports ourselves, and we give no opinion on your ground. On a hillside lot, we build only to plans the building department has approved, prepared by the designers and the licensed engineers and other professionals that the project and the parcel require, and ground reports are prepared by licensed professionals. Grading, earthwork and the other licensed trades are carried out by licensed subcontractors under our contract, as part of the building project we are contracted to build; we do not take grading or retaining walls as stand-alone jobs, and the written scope says who does each part. It is not a publication of the City of Los Angeles, Los Angeles County or the State of California, and it is not legal or engineering advice. The City and County rules above are for the City of Los Angeles and Los Angeles County; other departments, including Orange County and the cities of the Inland Empire, have their own, and the City Planning fact sheet is undated and may have been amended. Build times are typical ranges, not promised dates. Design, plan check and permits come before them and are not included, and inspections, utility connections, conditions found once work begins, and changes made during the job can all add time. Your written contract states the approximate start and completion dates for your job. Sources checked November 2026. Check with your building department before you rely on any of it.