EMC Development Solutions Corp, CSLB License #1160113, with a construction schedule drawn from site visit to certificate of occupancy
Client login

Eaton fire rebuild in Altadena: the help and the deadlines owners miss

California Contractor License #1160113, Class B (General Building)

Last updated November 18, 2026.

Quick answer

Altadena is unincorporated Los Angeles County land, so the County issues your rebuild permit. Three things owners miss. The County's own page says rebuild permit fees "will not be collected from property owners" of a primary residence. A like-for-like application is generally due within two years of the January 7, 2025 declaration, about January 7, 2027, and extensions may be granted. A permit can lapse if work sits idle. Call (909) 486-3818 to talk about building.

Call (909) 486-3818

Each item below names a kind of help or a deadline, says why it matters, and links the agency page that holds the rules. Most County recovery pages carry no date and they change, so read the agency page before you act.

Who issues your permit

Altadena is not a city. It is unincorporated Los Angeles County, so the County issues the permit. Public Works, Building and Safety checks plans and inspects the work. Regional Planning handles zoning, and the Fire Department and Public Health (for septic) also review.

One office takes all of it: the Altadena One-Stop Permit Center, 464 W Woodbury Rd, Suite 210, Altadena, (626) 424-6743. It offers free consultation appointments. Pasadena and Sierra Madre are separate cities with their own offices, and the County's rebuild programs do not apply there. The County's apply for permits page explains the online intake.

The permit fee waiver, and who it leaves out

The County's fee page, titled Fee Deferrals & Refunds, says "the fees will not be collected from property owners." It covers zoning, plan check, soils review, permit, inspection, Fire and Public Health fees, and fees you already paid can be refunded. It does not cover design, survey, utility or school fees. The page lists no deadline to apply. The County's FAQ puts the current building plan check and permit fee at about $12,000 for a 1,500 square foot home and $22,000 for a 3,000 square foot home, which is why the form is worth filing.

The waiver is for the owner who lived in the home as a primary residence before the fire. It does not cover LLCs or corporations, rentals, multi-family or commercial property. A trust can qualify. It is non-transferable, and an owner who has sold the property is not eligible.

The County's FAQ lists smaller relief too: a five-year extension of unused Planning entitlements, no library fee, and no Sanitation District fee for a single home already on sewer.

Rebuild the same size, with room to spare

The like-for-like path rebuilds what stood: same size, same place, same use. For the Eaton fire the County allows up to 10 percent or 200 square feet, whichever is greater, more in floor area, size, height or footprint. A like-for-like rebuild is exempt from the current Zoning Code, but not from the current Building, Fire, and Health and Safety codes. New ADUs are allowed.

A buyer keeps this path. The County's FAQ says it does not matter if the property has changed hands. A buyer does not keep the fee waiver. A buyer who leaves the old footprint is outside like-for-like and must meet the Altadena Community Standards District, including setbacks, and current zoning.

The date to watch: about January 7, 2027

The County's FAQ says a like-for-like application is generally required within two years of the January 7, 2025 declaration. That is about January 7, 2027. Extensions may be granted. Ask the Permit Center where your date stands before you count on one.

A permit can lapse when work sits idle

Under the County's Title 26 permit rule, a permit expires after 180 days of suspended work or with no inspection. An extension of up to 180 days can be requested in writing. The County's FAQ adds that a permit can expire at 12 months if construction never begins. An expired permit needs a new application. A stalled rebuild runs this clock.

Property tax relief that is easy to miss

The County Assessor can reassess a damaged property for misfortune and calamity. For the Eaton fire, the time to file is extended to 24 months from the loss, according to the State Board of Equalization, and the loss must exceed $10,000. Ask the Assessor for your exact filing date.

To keep the old property tax base on a rebuild, the usual five-year window is extended by three years, to eight, for the Eaton fire. For the 2025 fires, heirs have three years from a reassessment notice to file an exclusion claim. The Board of Equalization publishes the rules.

Late property tax payments have a way out too. The Treasurer and Tax Collector takes Penalty Cancellation Requests, and approved owners may have until June 30, 2030 to pay without penalties.

State help with financing

The State's Disaster Rebuilding Assistance Program, run by CalHFA, launched September 17, 2026. The State describes mortgage rate buydowns and loan-loss guarantees, aimed at low- to moderate-income owners. Check CalHFA's site for who qualifies and any deadline.

If you are buying or developing a burned lot

The like-for-like path stays with the lot, and the fee waiver does not. Plans may be filed early, but no building permit issues until debris is cleared. Reusing a foundation needs a design professional's written evaluation, and slab removal that disturbs soil deeper than 12 inches needs an engineer's compaction report. After the Army Corps cleanup, pools, hazardous-tree decisions and vacant-lot upkeep stay with the owner. The County's FAQ covers each.

If your rebuild contractor quits

We found no County form, fee or procedure published for changing the contractor on an issued permit. Ask the Building and Safety office that issued it. Meanwhile the clocks above keep running.

Start with which situation is mine. If the contractor walked off, read what to do when a contractor abandons the job. If the license shows suspended, read what a suspension means. For the permit side, see changing the contractor on a building permit. For an ADU, see finishing a half-built ADU.

A home rebuild is a home improvement job under State law, and the Contractors State License Board's rules apply: a fixed-price contract, a down payment of no more than $1,000 or 10 percent, whichever is less, and no later payment larger than the value of the work done. For a home damaged in a declared emergency, the contract must also give the owner seven business days to cancel. The County's contractor page repeats the CSLB's rules. The CSLB Disaster Hotline is (800) 962-1125.

Where do we fit?

EMC Development Solutions Corp is a licensed Class B general building contractor, CSLB #1160113. A house rebuild is work we take on. When we take over a stalled project, the Corp becomes the contractor of record on the permit, under its own license, and the Corp contracts the remaining work. We read the permit, the plans and the inspection record first. Then we put the scope and price in writing before work resumes.

We do not give legal advice, review disputes, or recover money. We do not take on fire debris removal or hazardous material work, which belong to other licensed trades. On the first call, we tell you whether the job is one we can take on, or what we need to see before we can say.

EMC Development Solutions Corp is a private building contractor. This page is general information. It is not a publication of Los Angeles County, the State of California, the Contractors State License Board or any other agency, and it is not legal or tax advice. Sources checked November 2026. Confirm every rule and date with the agency before you rely on it, and check with a California attorney before you act on a legal question.

See also hillside construction in Los Angeles, or contact us about your project.

Job stalled? Before we price a takeover, we do a paid assessment. Call (909) 486-3818 or ask about a paid assessment by email.

Call (909) 486-3818