Quick answer

Before you close on a hillside lot in Los Angeles, check four things a listing may not tell you: which hillside rules reach the lot (ZIMAS and the Bureau of Engineering's Hillside Referral Report); whether the street meets the City's access rules, because for a one-family dwelling a street under 20 feet wide or a dedication owed can hold up a permit; whether the lot sits in a fire zone, which adds construction, access and clearance rules; and what the ground reports on file say. We accept high-complexity hillside jobs. Questions about a lot you are buying? Call (909) 486-3818.

Call (909) 486-3818

This page is for investors and owners of multi-unit property, and for owners buying a hillside lot, in the City of Los Angeles or unincorporated Los Angeles County. It lists what to ask the agencies before you close. It is general information. It says nothing about any one lot, and it does not tell you whether a slope is stable or a design is adequate; those answers belong to the licensed professionals named below. The ground itself, the soils report and the foundation systems are on our page about hillside foundations in Los Angeles.

Plain words

Right-of-way: the full width of land set aside for a street. BOE reads it from its Cadastral Map Index.

Roadway: the paved part of the street. BOE reads it from its Engineering Vault plans.

Substandard Hillside Limited Street: a hillside street BOE finds below its standard of a 36-foot right-of-way and a 28-foot roadway. BOE decides which streets count.

Dedication: giving part of the lot to the City so the street reaches the required width. BOE's manual says that if half the right-of-way is under 18 feet, the difference is the required dedication.

B permit: the Bureau of Engineering permit that BOE's manual says widening a street requires.

Zoning Administrator (ZA, or ZAD for a Zoning Administrator determination): the City official whose approval can clear a project on a street with a roadway under 20 feet.

ZI-2462: a zoning information note that may show in a lot's ZIMAS property profile. City Planning says that if it shows, the Baseline Hillside Ordinance applies to the lot.

Hillside Referral Report (BAS): a report on NavigateLA. BOE says that if there is no link to it, the property is not subject to the Hillside Ordinance.

FIMS: the Fire Department's online portal for hydrant and access applications.

Before you close, in order

  1. Look the lot up in ZIMAS: its zone, whether ZI-2462 shows, and which zoning code governs it. Ask City Planning if you are unsure.
  2. Open the lot on NavigateLA and look for the Hillside Referral Report (BAS). If the lot is in a multi-family zone, or in the zones only BOE lists (A1, A2, RD), ask City Planning which hillside limits apply.
  3. Ask BOE about the street: the right-of-way, the roadway, any dedication owed, and whether a Zoning Administrator approval or a B permit would be needed. For a multi-unit building, ask City Planning and BOE whether the one-family street rules reach it.
  4. Find out whether the lot is in a fire zone: the Fire Department's Fire Zone Map, its Hydrants and Access inspector, brush clearance and the buyer disclosure. For a County lot, ask County Fire about fuel modification.
  5. Ask LADBS what soils and geology reports exist for the lot, and put the five ground questions in section 4 to the licensed professionals.
  6. Put each answer to the person who can give it, as listed under "Who can answer what".

1. Find out which hillside rules reach the lot

Three separate checks, each answered by a different agency.

A lot in a multi-family zone. Neither agency's list names R2, R3 or higher zones. For a lot in a multi-family zone, ask City Planning which hillside limits apply to it. The Hillside Grading Area and the fire hazard zones are separate maps with their own rules, covered below and on the foundations page.

When BOE writes it up. BOE's manual says the Hillside Referral Form process generally takes place only when a building permit application has also been filed. The manual points to BOE's Customer Service Request portal for requesting the form's preparation. If you are pricing a lot you do not yet own, ask BOE whether it will prepare the form for you.

Which zoning code. The City is moving to a new zoning code. City pages say it is in effect in Downtown (one page adds the Boyle Heights Community Plan Area); the original code still governs the rest of the City. Ask City Planning which code governs the lot you are looking at.

Two hillside maps. The City Planning Hillside Area is not the Hillside Grading Area of the Los Angeles Building Code, where the haul route hearing applies. The foundations page explains both. Check the lot against each.

2. Check the street before anything else

Buying for a multi-unit building? The street rules below are written for one-family homes. For a multi-unit building, ask City Planning and BOE whether they reach it before you rely on them.

A street too narrow for the City's rules can hold up a permit. City Planning's hillside checklist (form CP-4061, dated February 14, 2020) is the checklist for single family zones, and its street conditions apply to any new one-family dwelling or addition. Whether they reach a multi-unit building on your lot, ask City Planning and BOE. BOE determines whether a street is a Substandard Hillside Limited Street, and its manual states the standard as a 36-foot right-of-way and a 28-foot roadway. For a one-family dwelling on a lot fronting such a street:

  1. Dedication. No building or grading permit issues unless at least half the width of the street has been dedicated across the full width of the lot frontage, to Standard Hillside Limited Street dimensions or to a lesser width the City Engineer sets.
  2. A roadway under 20 feet. Where the street is improved with a roadway less than 20 feet wide, no building or grading permit issues unless the project has been approved through a Zoning Administrator process.
  3. No 20-foot route. Where there is no vehicular route on a continuous paved roadway at least 20 feet wide from the driveway apron to the boundary of the Hillside Area, the same bar applies unless a Zoning Administrator approves.

How BOE applies it. BOE fills in the Hillside Referral Form from its own records: right-of-way width from its Cadastral Map Index, roadway width from its Engineering Vault plans. Its manual says "If half R/W is less than 18 feet, then the difference will be the required dedication." If a roadway next to the lot is under 20 feet, "the Applicant is responsible for obtaining the ZAD or widen the roadway," and widening requires a B permit. BOE then sets the clearance on the LADBS Clearance Summary Worksheet: Pending, Denied, Approved or Approved with Conditions. Ask BOE what it needs to clear the street. An owner can ask BOE in writing to reduce a dedication, down to zero, with the worksheet, engineering reasons and site plans. BOE's manual allows a lesser dedication for engineering infeasibility or the physical restraints of topography, and says "Monetary considerations alone do not constitute extreme hardship under BOE policy."

For a buyer, each of these can add land given up, work to build or time to wait before a permit issues. Whether a given street is substandard, what dedication applies and whether a Zoning Administrator approval is available are questions for BOE and the Zoning Administrator, asked about the parcel. Designing a road widening is work for a licensed civil engineer. The BOE manual pages behind this section are "05, Hillside Referral Form Preparation" (revised July 2, 2025) and "09, BHO / Hillside Ordinance (Street(s) Along Lot Frontage(s) Minimum 20' Wide)" (revised February 19, 2026).

3. Find out if the lot is in a fire zone

In the City of Los Angeles

Zone maps are local and State maps; the Fire Department publishes a Fire Zone Map and a parcel brush clearance status tool. In a Very High or High Fire Hazard Severity Zone, a building follows the California Wildland-Urban Interface Code as amended by the City, and LADBS runs a supplemental checklist at plan check. A new building in a Very High zone also follows LABC section 7207. For a new house the checklist asks for these items, among others:

Whether a particular wall, vent or roof assembly complies is for the architect or engineer of record and for plan check. The checklist is LADBS document PC/STR/Corr.Lst.116, for the 2025 California Wildland-Urban Interface Code, effective January 1, 2026. It also says a roof covering on an existing building that is replaced, or that is 50 percent or more replaced within 12 months, must meet the new-construction roof requirements, which matters if you plan to remodel a hillside house.

Fire Department access and hydrants. The Fire Department's Hydrants and Access unit reviews hydrant placement and access to all sites and structures: width, turn-arounds and turning radii, grade, parking restrictions, overhead clearances, load capacity and secured entrances. The checklist calls for its clearance for projects in a Very High or High zone. Applications go through the Fire Department's FIMS portal (its online application system), and since October 13, 2026 they must use FIMS 2.0. Its page gives no hillside road-width or fire-flow number: an inspector assigned to the project forwards the requirements, so ask early.

Brush clearance. For owners in a Very High zone, the Fire Department says the property must be maintained year-round: brush, weeds, grass, trees and hazardous vegetation within 200 feet of any structure, whether the structure is on the owner's property or a neighbor's, and within 10 feet of a combustible fence or a roadway or driveway used for vehicles. The Fire Department's brush clearance page, as of November 2026, is marked revised February 9, 2017.

Disclosure to a buyer. The Fire Department states that State law (AB 38) requires specific disclosures to buyers of residential property in a Very High zone, beginning January 1, 2021. It names the C.A.R. form FHDS.

In unincorporated Los Angeles County

The County Fire Department requires a fuel modification plan for a new structure, or an addition of 50 percent or more of the existing square footage, within a State Responsibility Area fire zone or a Very High zone in a local responsibility area. Zone 1 reaches 30 feet from each structure, Zone 2 reaches 100 feet and Zone 3 reaches 200 feet or the property line. The plan is a landscape plan to scale, submitted online, with plants drawn at 75 percent maturity and labeled by scientific name. The site inspection for the certificate of occupancy follows landscape installation. The County's hillside zoning is also under revision: Regional Planning has published a draft Hillside Management Areas ordinance (May 2026). It is a draft, not law, and we have not confirmed its current status, so ask County Planning before you buy in a County hillside area.

4. Ask what the ground reports say

These are the five questions to ask about the ground. The reasons behind each are on the hillside foundations page.

  1. What soils and geology reports exist at LADBS for this lot and its neighbors, how old are they, and approved with what conditions?
  2. Is the lot in a Seismic Hazard Zone, an Alquist-Priolo zone or a City fault study area, and what investigation follows?
  3. What do the soils engineer and the engineering geologist say about slopes steeper than 2:1 on or above the lot, landslides, bedding, fill and seeps?
  4. How many cubic yards are cut, filled, imported and exported, on what kind of street, against the 1,000 cubic yard hearing line and the zone cap?
  5. Where does the water go, and what stands next to the excavation?

Who can answer what

How we work on a hillside job

We accept high-complexity hillside jobs and build from plans the building department has approved. The designers and licensed engineers the project requires prepare the plans, and licensed professionals prepare the ground reports. We do not take grading, shoring or retaining walls as stand-alone jobs; they are part of the building project we contract to build. Read how we work as a hillside contractor in Los Angeles, or see our multi-unit construction.

Questions buyers ask

How do I find out whether the Baseline Hillside Ordinance applies to a lot?

City Planning says the ordinance applies if Zoning Information ZI-2462 is shown in the lot's ZIMAS property profile. The Bureau of Engineering says to open the lot on NavigateLA and select "Hillside Referral Report (BAS)" under Available Parcel Reports; if there is no link, the property is not subject to the Hillside Ordinance. The two agencies list different zones, so check both and ask City Planning if the lot is in a multi-family zone.

What is a substandard hillside limited street, and why check it before I buy?

The Bureau of Engineering determines whether a street is a Substandard Hillside Limited Street; its manual states the standard as a 36-foot right-of-way and a 28-foot roadway. For a new one-family dwelling or an addition on such a street, City Planning's checklist bars a building or grading permit until half the street width is dedicated across the lot frontage, and where the roadway is under 20 feet it bars the permit unless a Zoning Administrator approves the project. Ask the Bureau of Engineering about the street before you close.

What does a Very High Fire Hazard Severity Zone mean for someone buying a lot?

The Los Angeles Fire Department states that California law requires specific disclosures to buyers of residential property in the zone. A new building there follows the City's fire-zone construction checklist and the Fire Department reviews hydrant placement and access. The owner also keeps the property cleared of brush year-round within 200 feet of any structure, whether the structure is the owner's or a neighbor's.

Sources

Note. EMC Development Solutions Corp is a private building contractor, California Contractor License #1160113, Class B (General Building). This page is general information, not a publication of the City of Los Angeles, Los Angeles County or any agency, and it is not legal, engineering or real estate advice. We do not prepare plans or ground reports, and we give no opinion on your lot, your ground or your slope. We read the agencies' own forms and pages in November 2026. We could not open the municipal code text itself, so section numbers and figures may differ from the current code, and we left out the code section for the Zoning Administrator process because the City's sources cite it two ways. The City Planning checklist is dated February 14, 2020, the Fire Department's brush clearance page shows a 2017 revision, and the City's new zoning code is phasing in, so numbers and forms may have changed. Check with City Planning, the Bureau of Engineering, LADBS and the Fire Department before you rely on any of it.

Learn about our multi-unit construction, how we take on hillside construction in Los Angeles and the hillside foundations behind it, or contact us about your project.

Looking at a hillside lot? Call (909) 486-3818.

Call (909) 486-3818